Showing posts with label 0-4-4T. Show all posts
Showing posts with label 0-4-4T. Show all posts

Friday, 21 May 2021

STEAM TOURS - THE SOUTH DEVON EXPLORER - TORNADO 60163

THE SOUTH DEVON EXPLORER - TORNADO 60163
The South Devon Explorer
Saturday 29th May 2021
The South Devon Explorer offers an exceptional day out travelling by train from stations in Berkshire to Plymouth in South Devon. We travel along the famous ‘sea wall’ from Dawlish to Teignmouth and over the South Devon banks through Totnes. The special train will be hauled from Bristol to Plymouth and back by steam locomotive No. 60163 Tornado.

Our train starts from Woking in Surrey and will be diesel hauled from there to Bristol. There are additional stops at Guildford, Reading and Newbury to pick up more passengers. The route follows the river Kennet through attractive countryside and then runs beside the Kennet and Avon Canal for some distance before we make our final stop for passengers at Westbury. Once the tour has reached Bristol we will be able to make the change of motive power where steam locomotive No. 60163 Tornado will take over the train.

We shall soon be speeding along through the Somerset countryside and across the Somerset Levels to Taunton, where we make a brief stop for our steam locomotive to take on water. Our steam locomotive will be working hard as we climb to Whiteball Summit on the Somerset and Devon border before descending through the Culm Valley to Exeter.
The route will follow the Exe Estuary, passing the picturesque Cockwood Harbour, and run along the famous sea wall from Dawlish to Teignmouth. This is one of the most famous and scenic stretches of railway line in Britain, which gained international prominence when part of it was washed away in the 2014 storms. After Newton Abbot, we follow the South Devon line to Plymouth. Immediately we start to climb the very steep gradient of Dainton Bank. The climb twists and turns all the way to the summit at Dainton Tunnel.

A short reprieve for our fireman follows as we descend the gradient to Totnes, which will allow time to get the boiler pressure up for the next climb of Rattery Bank. Gradients as steep as 1 in 47 run for four miles to Rattery before they ease off for the remainder of the climb to the summit at Wrangaton. Running along the southern edge of Dartmoor, we descend towards Plymouth, our destination for the afternoon. There will be time here to visit this modern city, with its many attractions, including the Hoe with Smeaton’s Tower, the old Barbican area with the Mayflower Steps, and the many shops in the city centre. The return journey as far as Taunton will be steam hauled by Tornado. The first real challenge faced will be the ascent of the 1 in 42 gradient of Hemerdon Bank just outside Plymouth. There is also the climb to Dainton Tunnel from Totnes, followed by the return run along the Dawlish sea wall to Exeter. From Taunton, the train will be diesel hauled back to Woking. We stop at the same stations as on the outward journey, to set down passengers.

Steam Hauled by A1 Class Pacific '60163 Tornado'
The original Peppercorn A1 series were ordered by the LNER, but the 49 locomotives were built at Doncaster and Darlington for British Railways (BR) in 1948–49, after the nationalisation of the railways in the United Kingdom. Following the modernisation and dieselisation plans of the 1950s, the A1 Peppercorn class was eventually scrapped at a comparatively early age of just 15 years.

The original Peppercorn A1s were designed to cope with the heaviest regular post-war East Coast trains. The A1 Trust intended Tornado to be built from scratch, designed and built as the next locomotive in the A1 Peppercorn class, not as a replica or restoration project, but an evolution of the class incorporating design improvements that would have occurred had steam motive power continued on the mainline railway.
  
Tornado moved under its own power for the first time on 29th July 2008 at Darlington, and then spent two months at the Great Central Railway in Loughborough, where it was tested up to 60 mph (97 km/h) and operated its first passenger train. Tornado then moved to the National Railway Museum (NRM) in York for three test runs on the main line up to 75 mph (121 km/h). After repainting from works grey into LNER Apple Green, Tornado was approved for mainline passenger operation. On 31st January 2009 Tornado hauled its first passenger trip on the main line, The Peppercorn Pioneer, from York to Newcastle and back. By hauling various A1 Trust railtours, charters and other activities, Tornado will begin to recoup the estimated £800,000 debt from the project, which cost around £3 million.

Tuesday, 21 November 2017

O GAUGE CLASS M7 SOUTHERN REGION NO 42 [SOLD]

O Gauge Model from Geoff Tyler
7mm SCALE [O GAUGE] CLASS M7 MODEL
BUILT FOR SOUTHERN REGION No.42

Most probably built from an old CCW Kit made from White Metal and Brass and the rest would have been scratch built by my late father. Not sure if it's his attempt at painting and lining but it's not the best if honest and maybe deteriorating with age as I know this was out on display for a long time at home. 
Southern Region Tank loco, O Gauge built by Geoff Tyler
Believed to have a brass boiler and smoke stack but rest being white metal. Certainly the cab roof is made from that material and as a result is a lot heavier than other similar sized models that I had in my possession. Despite the paint job needing a little work it's still a very well built model and has the level of detail I see on all of Dads models. 

There's still plenty of detail inside and out as expected from one of Dads models, the paint job is in a Malachite Green rather than the later and what I would call the traditional Darker Green of the Southern Region. That probably helps to date the model a bit more into the early part of the 20th Century and I am still of the opinion that it would look even better with a fresh paint job and relined, of course that would need someone with a talent for such things. 




The model's roof is detachable which I feel was deliberate to allow access to the interior detail, it wasn't showing any signs of being broken just simply able to slide on and off. Could be easily fixed down on a permanent basis using any suitable brand of "super glue" or resin. The interior details are clear with brass pipes and levers, plus the Driver and Fireman figures, and all the external details are intact including rods, rails, buffers and brake pipework. 
O Gauge Class M7 Southern Region Model

Overall a very tidy looking model of it's age. 

Wednesday, 22 March 2017

O GAUGE MODEL -- LNER CLASS G5 -- 0-4-4T (No 1319)

MODEL INFORMATION
O Gauge -- Class G5
0-4-4T Tank Locomotive 
LNER No 1319

Hand built by my late father Mr Geoff Tyler in the late 1990's believed to have originated from a Gladiator kit.



Generally this model is intact with plenty of detail as seen in pictures only two small notes;
  1) the cab roof is not permanently sealed down, probably deliberate as this was common on a lot of his models guess it was to allow access to the cab detail.
  2) there was possibly a "whistle" or small detail on the top of the cab that is no longer there, while I'd rate this as a minor blemish which can be easily rectified by any modeler it's still worth pointing out up front. 



As stated it's not been used for some time and would benefit from a bit of tlc and running in. 



BACKGROUND
On becoming the North Eastern Railway's (NER) Locomotive Superintendent, Wilson Worsdell switched the NER's passenger tank locomotive policy from his brother's 2-4-2T Class A (LNER F8) design, back to a design resembling Fletcher's 0-4-4T BTP (LNER G6), with his G5 design. Compared to the F8s, the G5s had smaller driving wheels and greater coal and water capacities. A total of 110 were built between 1894 and 1901, across seven batches.




The later batches replaced many of the BTPs (LNER G6), which were then converted to 0-6-0Ts (LNER J77) or push-pull locomotives.

The G5 design served its purpose well, and no substantial changes had been made by Grouping in 1923. A modified boiler design with a single-plate barrel was used by the LNER after 1930 for replacements. This design was further modified from 1937 with an increase in boiler tubes to 205. This second modification had a dome 20in further back than on the earlier boilers.

The G5s were noted for being sturdy, working long and economical careers. They worked throughout the North-East area, and could be found on both branch line passenger trains and the heavier suburban trains. They were regularly clocked at 60mph on the Middlesbrough to Newcastle services. The G5s were only moved away from these heavier suburban services with the arrival of the larger A8s, V1s and V3s.

During the late 1920s and early 1930s, many of the G5s were replaced with steam railcars. In turn, the displaced G5s replaced withdrawn F8s and G6s. In further attempts to economise on branch-line routes, twenty-one G5s were converted for vacuum-operated push-pull working from 1937.
The G5s survived pretty much intact to 1949. The first withdrawal was in 1950, but most were withdrawn between 1955 and 1958 as they were replaced by diesel railcars and DMUs (diesel multiple units). The last G5 was withdrawn in 1958.


Technical Details

The following dimensions describe the G5s when they entered LNER ownership. Very few changes had been made since they were built.

Cylinders (x2): 18x24in.
Motion: Stephenson
Boiler:
    Diameter (max): 4ft 3in 
    Length: 10ft 3in
    Boiler pressure: 160psi
Heating Surface:
    Total:   1093 sq.ft.
    Firebox: 98 sq.ft.
    Tubes:   995 sq.ft. (205x 1.75")
    Grate Area: 15.6 sq.ft.
Wheels:
    Coupled: 5ft 1.25in

    Trailing: 3ft 1.25in
Tractive Effort (85%): 17,200
Length: 35ft 9.75in
Total Wheelbase: 22ft 6in
Coal Capacity: 3 tons 0cwt
Water Capacity: 1360 gallons

Preservation

Sadly none of the G5s survived into preservation. 


However, the "Class G5 Locomotive Company Limited" has been formed to build a brand new G5 for use on preservation lines primarily in the north east.

http://www.g5locomotiveltd.co.uk/

Models
Finney and Smith produce a 3mm scale kit of the G5.

Alan Gibson, London Road Models, Dave Alexander, and Nu-Cast all sell kits of the G5 for OO gauge (4mm scale).

Both Connoisseur and Gladiator sell kits in O gauge (7mm).